Skip to main content

SQF Edition 10 audits start January 2027. Is your program ready? Learn more โ†’

Back to Insights

Guides · Jul 10, 2026 · Updated Sep 8, 2026 · 2 min read

FSMA 204 Traceability: The Records You Need Before July 2028

Enforcement is set for July 20, 2028. The Critical Tracking Events, the Key Data Elements, and why the records you capture from the first lot forward are the ones that count.

FSMA 204 enforcement is set for July 20, 2028. If your products or ingredients are on the Food Traceability List, you will need to capture and keep specific records at specific points in your process, and produce them to FDA within 24 hours of a request. The rule is less complicated than its reputation, but it punishes late starts, because the records only exist if you were capturing them when the lot moved.

First, find out if you are covered

Check the Food Traceability List for your products and your ingredients. Coverage follows the food, and a covered ingredient inside your product can pull your process into scope. Many processors are covered by what they receive, not what they ship.

The events that must leave a record

  • Receiving: what arrived, from whom, and the traceability lot code it carried

  • Transformation: what you made, from which input lots, under which new lot code

  • Shipping: what left, to whom, under which lot code

Each event carries its Key Data Elements: lot codes, dates, locations, and quantities. The linchpin is the traceability lot code staying connected through transformation, because that link is exactly what a traceback follows.

The 24-hour test

The practical standard is simple to state: given a lot code, can you produce everything it touched, in both directions, within 24 hours, in a sortable electronic format. If the answer involves a person, a filing cabinet, and a weekend, you have your gap. Run the drill once and the gap names itself.

Why the smart money starts now

Records are not retroactive. The traceability chain you can produce in 2028 is built from what you captured in 2026 and 2027. Retailers are already asking suppliers for FSMA 204 readiness ahead of the deadline, which means the real enforcement date for many facilities is whenever their biggest customer asks.

Run a food safety program? See how Beacon keeps it audit-ready.

See Beacon in 20 minutes